Gloucester Docks dredging project costing £4m begins

Silt levels in the docks have left boats stranded and led to the docks closing this summer.
BBC Science reported this story. Read the full report on bbc.co.uk →

Silt levels in the docks have left boats stranded and led to the docks closing this summer.
BBC Science reported this story. Read the full report on bbc.co.uk →
Leave a Reply